How Long Does a Kitchen Renovation Take?

When homeowners consider renovations, the kitchen frequently becomes the focal point of any vision. Your kitchen is the heart of your home, a vibrant social hub, and a practical space that should accommodate your family's needs and lifestyle. As the central hub of most households, kitchens must strike a balance between form and function. Beyond mere functionality, your dream kitchen should radiate warmth and be perfectly customized to meet both present and future needs. If your kitchen suffers from insufficient storage, limited counter space, or feels confined, a renovation can significantly enhance and transform your entire home. In this guide, we answer the most-asked questions about kitchen renovations and guide you through the process of bringing your kitchen remodeling visions to life.

How Long Does a Kitchen Renovation Take?
TABLE OF CONTENT
Toc title
Icon Input drop

Table of Contents

Kitchen Renovation Timeline

A Kitchen Renovation Can Take Longer Than Estimated

Week-By-Week Timeline Of Kitchen Renovations

1. Pre-Construction Phase

1.1. Planning The Kitchen Design

1.2. Picking The Right Kitchen Selections

1.3. Construction Drawings

1.4. Applying For Permits

1.5. Ordering Materials

2. Construction Phase

2.1. Week 1

2.2. Week 2

2.3. Week 3

2.4. Week 4-5

2.5. Week 6

2.6. Week 7-8

2.7. Week 9-10

Frequently Asked Questions

Kitchen Renovation Timeline

One of the most asked questions that we receive from homeowners is “How long does a kitchen renovation take?” Typically, the answer to this question depends on the complexity, the size of the space, and the scope of the remodeling project. It is further essential to also identify what you want in your new space. Do you need more storage? Are you short on counter space? Are there any major shortcomings in your current layout? We recommend that homeowners address these issues first to make the next steps easier.

A full kitchen renovation, involving changes to plumbing and electrical service locations, along with all new appliances, products, kitchen island, and finishes, can take between 3 to 5 months, depending on the kitchen's size and complexity. Smaller cosmetic updates, such as new cabinets, countertops, and backsplash without altering the floor plan, can be completed in just a few weeks.

If your kitchen remodeling plan involves altering the footprint and moving the kitchen from one part of your home to another which requires city permits and board approvals, a kitchen renovation in this case may require several months because there are many moving parts and many parties involved with certain aspects beyond your control.

How long does a kitchen renovation take if the kitchen design is straightforward? If this is the case and new components are simply replacing the old ones in the same layout, this is called a replacement kitchen. This type of project involves minimal construction or customization and typically takes about 6-8 weeks for a moderately sized kitchen. On the other hand, kitchen remodeling projects that involve larger spaces, wall removals, structural changes, and floor plan reconfigurations take longer. For a custom kitchen renovation, a fair expectation is at least 10-12 weeks.

A Kitchen Renovation Can Take Longer Than Estimated

An efficient kitchen renovation project relies on a well-structured schedule. Your project manager will outline a series of sequential steps to follow. However, even the most meticulously planned renovations can encounter delays, which are not necessarily due to incompetence or carelessness. Kitchen renovations involve many specialty subcontractors and numerous special-order products which makes scheduling complex. With everything interconnected, minor hiccups are inevitable. Typically, project management handles these issues, ensuring that any delays are minimal and not project-stopping.

Week-By-Week Timeline Of Kitchen Renovations 

How long does a kitchen renovation take from start to finish? A successful kitchen renovation involves two phases: pre-construction and construction. The pre-construction phase of kitchen remodeling includes the following components:

1. Pre-Construction Phase

1.1. Planning The Kitchen Design 

There’s an age-old saying that goes “Measure twice, cut once” and this holds very true for kitchen renovations and remodeling projects. Building a blueprint for your kitchen renovation is an exciting time, as this stage allows you to infuse new life into your dream kitchen and make it a reality. Regardless of whether you decide to work with a professional designer or utilize online tools and software, it is just as essential to dedicate sufficient time to plan and design a new kitchen to ensure that the result aligns with your expectations. The following features are important to consider during the kitchen design planning stage:

  • Deciding which parts of the kitchen will stay or be replaced
  • Choosing a layout and color scheme
  • Selecting materials and finishes
  • Establishing a clear budget
  • Identifying any necessary structural or electrical changes 
  • Understanding how long a kitchen renovation takes and creating a project timeline

In addition to the above, the design and planning phase of a kitchen renovation includes floor plans, elevations, furniture plans, and lighting and electrical plans.

1.2. Picking The Right Kitchen Selections

This phase involves selecting the following for the kitchen renovation:

  • Appliances
  • Plumbing Fixtures
  • Floors
  • Cabinets
  • Countertops
  • Backsplash
  • Lighting fixtures
  • Cabinet hardware


1.3. Construction Drawings

Construction drawings are essential in a kitchen renovation project, as these serve as a detailed blueprint for the entire process which transforms kitchen design concepts into a functional and beautiful kitchen space. The drawings provide precise measurements and specifications for every aspect of the remodel which includes cabinetry, appliances, plumbing, and electrical systems. They ensure that all contractors and subcontractors are aligned with the design vision and technical requirements which minimizes errors and discrepancies for a smooth project. By clearly outlining the layout, materials, and installation procedures, construction drawings facilitate smooth communication among the project team and help keep the renovation on schedule. This is crucial for understanding how long a kitchen renovation takes and staying within budget.

1.4. Applying For Permits

Applying for permits is a crucial step in a kitchen renovation which ensures that the project complies with local building codes and regulations to meet all necessary standards. This process typically involves submitting detailed plans with construction drawings to the local building department for review. Permits may be necessary for different components of the renovation such as electrical work, plumbing changes, structural modifications, and installation of new appliances. Obtaining the necessary permits not only helps avoid potential legal issues and fines but also secures the safety and integrity of the renovation. 

1.5. Ordering Materials

Understanding ‘how long does a kitchen renovation take’ includes considering whether a design plan involves selecting and ordering everything from cabinetry, countertops, and floors to kitchen appliances, light fixtures, and finishes for the kitchen renovation. It is necessary to select high-quality materials that align with the design vision and functional requirements of the kitchen, where accurate measurements and detailed specifications are essential to ensure that all components fit well and work seamlessly together. Additionally, it is important to account for lead times since some materials may need to be custom-made or shipped from distant locations. Managing the ordering process properly helps to prevent delays, allows the renovation to remain on schedule, and ensures that the final result meets design expectations.

2. Construction Phase

The construction phase of a kitchen renovation includes the following:

2.1. Week 1

This initial phase involves several foundational tasks that need to be completed to set the stage for the entire renovation, such as the following:

  • Preparation and Planning: This involves finalizing details with the contractor and ensuring that all necessary permits are secured. Understanding “how long does a kitchen renovation take?” can help in setting realistic timelines and expectations for the project.
  • Demolition: This step consists of removing old cabinetry, countertops, appliances, and fixtures which clears the space and allows the team to inspect the underlying structures.
  • Site Setup: This involves establishing a temporary kitchen area if required and organizing the workspace. This task also involves installing protective measures like dust barriers and floor coverings to protect the rest of the home.
  • Initial Inspections: This involves checking the plumbing, electrical, and structural features of the kitchen to identify any issues that need to be resolved before proceeding.

2.2. Week 2

In the second week of a kitchen remodeling project, the focus shifts to securing the groundwork for the new kitchen installation. This involves:

  • Framing and Structural Work: Modifications such as moving or removing walls, creating new openings, or reinforcing existing structures, are completed.
  • Plumbing Rough-Ins: Installing new plumbing lines or adjusting existing ones to fit the new kitchen layout are completed during this time, including running water lines, drainage systems, and gas lines.
  • Electrical Rough-Ins: Updating or installing new electrical wiring, outlets, and lighting fixtures according to the new kitchen design. 

2.3. Week 3

Week 3 involves insulation inspection, installing insulation, and finishing drywall installation which includes taping, mudding, and sanding.

2.4. Week 4-5

How long does a kitchen renovation take when installing flooring? Larger areas in a kitchen will take longer to cover, and if the subfloor requires significant preparation or repairs, this can extend the timeline. Here is what typically happens in weeks 4 and 5 of kitchen renovations:

  • Flooring Installation: Finalizing subfloor preparations and installing flooring material such as tile, hardwood, or laminate also includes cutting and securing the flooring to the room dimensions to ensure a secure fit.
  • Cabinet Installation Preparation: Unpacking cabinetry and assembling the cabinets for installation.
  • Electrical And Plumbing Finishes: Installing remaining electrical wiring or fixtures, and ensuring plumbing connections are ready for sink and faucet installation.

2.5. Week 6

The focus shifts to installing and setting up key components of the kitchen during week 6:

  • Cabinet Installation: Installing upper and lower cabinets according to the finalized layout.
  • Countertop Installation: Installing countertops and sealing any seams.
  • Lighting Fixtures: Installing lighting and fixtures, such as overhead lights, under-cabinet lighting, and any additional lighting.
  • Plumbing Fixtures: Installing sinks and faucets.
  • Backsplash Preparation: Surface cleaning and preliminary work before backsplash installation.

To ensure that everything proceeds smoothly, it is helpful to understand how long does a kitchen renovation take during these stages, which can aid in managing your project timeline effectively.

2.6. Week 7-8

In weeks 7 and 8 of a kitchen renovation, the focus is on completing installations and refining the details of the space, which include the following:

  • Appliance Installation: Installing the refrigerator, oven, dishwasher, and microwave and connecting appliances to electrical, plumbing, and gas lines to ensure they are in working order.
  • Backsplash Installation: Installing tiles, panels, or other finishes and applying grout, sealing, and cleaning the backsplash to ensure a polished look.
  • Countertop Finishing: Applying finishing touches to countertops such as sealing natural stone or installing undermount sinks.

2.7. Week 9-10

In weeks 9 and 10 of a kitchen renovation, the focus is on finalizing the details and ensuring that the space is fully ready for use. 

  • Final Cleaning: Cleaning the countertops, floors, and cabinetry to remove remaining construction dust, debris, or fingerprints.
  • Final Inspection: Performing a walkthrough to ensure that the renovation meets quality standards and project specifications.
  • Hand Over and Setup: Setting up the kitchen, including arranging the appliances and making sure everything is operational.

Whether you're planning a complete kitchen renovation or selective updates, Zen Living’s comprehensive kitchen remodel service has you covered. We offer cabinet replacements, hardware upgrades, second sink installations, plumbing fixture updates, layout optimization for efficiency, appliance upgrades, flooring modernization, and more. Contact us today to get started!

Table of Contents

Kitchen Renovation Timeline

A Kitchen Renovation Can Take Longer Than Estimated

Week-By-Week Timeline Of Kitchen Renovations

1. Pre-Construction Phase

1.1. Planning The Kitchen Design

1.2. Picking The Right Kitchen Selections

1.3. Construction Drawings

1.4. Applying For Permits

1.5. Ordering Materials

2. Construction Phase

2.1. Week 1

2.2. Week 2

2.3. Week 3

2.4. Week 4-5

2.5. Week 6

2.6. Week 7-8

2.7. Week 9-10

Frequently Asked Questions

Kitchen Renovation Timeline

One of the most asked questions that we receive from homeowners is “How long does a kitchen renovation take?” Typically, the answer to this question depends on the complexity, the size of the space, and the scope of the remodeling project. It is further essential to also identify what you want in your new space. Do you need more storage? Are you short on counter space? Are there any major shortcomings in your current layout? We recommend that homeowners address these issues first to make the next steps easier.

A full kitchen renovation, involving changes to plumbing and electrical service locations, along with all new appliances, products, kitchen island, and finishes, can take between 3 to 5 months, depending on the kitchen's size and complexity. Smaller cosmetic updates, such as new cabinets, countertops, and backsplash without altering the floor plan, can be completed in just a few weeks.

If your kitchen remodeling plan involves altering the footprint and moving the kitchen from one part of your home to another which requires city permits and board approvals, a kitchen renovation in this case may require several months because there are many moving parts and many parties involved with certain aspects beyond your control.

How long does a kitchen renovation take if the kitchen design is straightforward? If this is the case and new components are simply replacing the old ones in the same layout, this is called a replacement kitchen. This type of project involves minimal construction or customization and typically takes about 6-8 weeks for a moderately sized kitchen. On the other hand, kitchen remodeling projects that involve larger spaces, wall removals, structural changes, and floor plan reconfigurations take longer. For a custom kitchen renovation, a fair expectation is at least 10-12 weeks.

A Kitchen Renovation Can Take Longer Than Estimated

An efficient kitchen renovation project relies on a well-structured schedule. Your project manager will outline a series of sequential steps to follow. However, even the most meticulously planned renovations can encounter delays, which are not necessarily due to incompetence or carelessness. Kitchen renovations involve many specialty subcontractors and numerous special-order products which makes scheduling complex. With everything interconnected, minor hiccups are inevitable. Typically, project management handles these issues, ensuring that any delays are minimal and not project-stopping.

Week-By-Week Timeline Of Kitchen Renovations 

How long does a kitchen renovation take from start to finish? A successful kitchen renovation involves two phases: pre-construction and construction. The pre-construction phase of kitchen remodeling includes the following components:

1. Pre-Construction Phase

1.1. Planning The Kitchen Design 

There’s an age-old saying that goes “Measure twice, cut once” and this holds very true for kitchen renovations and remodeling projects. Building a blueprint for your kitchen renovation is an exciting time, as this stage allows you to infuse new life into your dream kitchen and make it a reality. Regardless of whether you decide to work with a professional designer or utilize online tools and software, it is just as essential to dedicate sufficient time to plan and design a new kitchen to ensure that the result aligns with your expectations. The following features are important to consider during the kitchen design planning stage:

  • Deciding which parts of the kitchen will stay or be replaced
  • Choosing a layout and color scheme
  • Selecting materials and finishes
  • Establishing a clear budget
  • Identifying any necessary structural or electrical changes 
  • Understanding how long a kitchen renovation takes and creating a project timeline

In addition to the above, the design and planning phase of a kitchen renovation includes floor plans, elevations, furniture plans, and lighting and electrical plans.

1.2. Picking The Right Kitchen Selections

This phase involves selecting the following for the kitchen renovation:

  • Appliances
  • Plumbing Fixtures
  • Floors
  • Cabinets
  • Countertops
  • Backsplash
  • Lighting fixtures
  • Cabinet hardware


1.3. Construction Drawings

Construction drawings are essential in a kitchen renovation project, as these serve as a detailed blueprint for the entire process which transforms kitchen design concepts into a functional and beautiful kitchen space. The drawings provide precise measurements and specifications for every aspect of the remodel which includes cabinetry, appliances, plumbing, and electrical systems. They ensure that all contractors and subcontractors are aligned with the design vision and technical requirements which minimizes errors and discrepancies for a smooth project. By clearly outlining the layout, materials, and installation procedures, construction drawings facilitate smooth communication among the project team and help keep the renovation on schedule. This is crucial for understanding how long a kitchen renovation takes and staying within budget.

1.4. Applying For Permits

Applying for permits is a crucial step in a kitchen renovation which ensures that the project complies with local building codes and regulations to meet all necessary standards. This process typically involves submitting detailed plans with construction drawings to the local building department for review. Permits may be necessary for different components of the renovation such as electrical work, plumbing changes, structural modifications, and installation of new appliances. Obtaining the necessary permits not only helps avoid potential legal issues and fines but also secures the safety and integrity of the renovation. 

1.5. Ordering Materials

Understanding ‘how long does a kitchen renovation take’ includes considering whether a design plan involves selecting and ordering everything from cabinetry, countertops, and floors to kitchen appliances, light fixtures, and finishes for the kitchen renovation. It is necessary to select high-quality materials that align with the design vision and functional requirements of the kitchen, where accurate measurements and detailed specifications are essential to ensure that all components fit well and work seamlessly together. Additionally, it is important to account for lead times since some materials may need to be custom-made or shipped from distant locations. Managing the ordering process properly helps to prevent delays, allows the renovation to remain on schedule, and ensures that the final result meets design expectations.

2. Construction Phase

The construction phase of a kitchen renovation includes the following:

2.1. Week 1

This initial phase involves several foundational tasks that need to be completed to set the stage for the entire renovation, such as the following:

  • Preparation and Planning: This involves finalizing details with the contractor and ensuring that all necessary permits are secured. Understanding “how long does a kitchen renovation take?” can help in setting realistic timelines and expectations for the project.
  • Demolition: This step consists of removing old cabinetry, countertops, appliances, and fixtures which clears the space and allows the team to inspect the underlying structures.
  • Site Setup: This involves establishing a temporary kitchen area if required and organizing the workspace. This task also involves installing protective measures like dust barriers and floor coverings to protect the rest of the home.
  • Initial Inspections: This involves checking the plumbing, electrical, and structural features of the kitchen to identify any issues that need to be resolved before proceeding.

2.2. Week 2

In the second week of a kitchen remodeling project, the focus shifts to securing the groundwork for the new kitchen installation. This involves:

  • Framing and Structural Work: Modifications such as moving or removing walls, creating new openings, or reinforcing existing structures, are completed.
  • Plumbing Rough-Ins: Installing new plumbing lines or adjusting existing ones to fit the new kitchen layout are completed during this time, including running water lines, drainage systems, and gas lines.
  • Electrical Rough-Ins: Updating or installing new electrical wiring, outlets, and lighting fixtures according to the new kitchen design. 

2.3. Week 3

Week 3 involves insulation inspection, installing insulation, and finishing drywall installation which includes taping, mudding, and sanding.

2.4. Week 4-5

How long does a kitchen renovation take when installing flooring? Larger areas in a kitchen will take longer to cover, and if the subfloor requires significant preparation or repairs, this can extend the timeline. Here is what typically happens in weeks 4 and 5 of kitchen renovations:

  • Flooring Installation: Finalizing subfloor preparations and installing flooring material such as tile, hardwood, or laminate also includes cutting and securing the flooring to the room dimensions to ensure a secure fit.
  • Cabinet Installation Preparation: Unpacking cabinetry and assembling the cabinets for installation.
  • Electrical And Plumbing Finishes: Installing remaining electrical wiring or fixtures, and ensuring plumbing connections are ready for sink and faucet installation.

2.5. Week 6

The focus shifts to installing and setting up key components of the kitchen during week 6:

  • Cabinet Installation: Installing upper and lower cabinets according to the finalized layout.
  • Countertop Installation: Installing countertops and sealing any seams.
  • Lighting Fixtures: Installing lighting and fixtures, such as overhead lights, under-cabinet lighting, and any additional lighting.
  • Plumbing Fixtures: Installing sinks and faucets.
  • Backsplash Preparation: Surface cleaning and preliminary work before backsplash installation.

To ensure that everything proceeds smoothly, it is helpful to understand how long does a kitchen renovation take during these stages, which can aid in managing your project timeline effectively.

2.6. Week 7-8

In weeks 7 and 8 of a kitchen renovation, the focus is on completing installations and refining the details of the space, which include the following:

  • Appliance Installation: Installing the refrigerator, oven, dishwasher, and microwave and connecting appliances to electrical, plumbing, and gas lines to ensure they are in working order.
  • Backsplash Installation: Installing tiles, panels, or other finishes and applying grout, sealing, and cleaning the backsplash to ensure a polished look.
  • Countertop Finishing: Applying finishing touches to countertops such as sealing natural stone or installing undermount sinks.

2.7. Week 9-10

In weeks 9 and 10 of a kitchen renovation, the focus is on finalizing the details and ensuring that the space is fully ready for use. 

  • Final Cleaning: Cleaning the countertops, floors, and cabinetry to remove remaining construction dust, debris, or fingerprints.
  • Final Inspection: Performing a walkthrough to ensure that the renovation meets quality standards and project specifications.
  • Hand Over and Setup: Setting up the kitchen, including arranging the appliances and making sure everything is operational.

Whether you're planning a complete kitchen renovation or selective updates, Zen Living’s comprehensive kitchen remodel service has you covered. We offer cabinet replacements, hardware upgrades, second sink installations, plumbing fixture updates, layout optimization for efficiency, appliance upgrades, flooring modernization, and more. Contact us today to get started!

Frequently Asked Questions

Frequently Asked Questions

Frequently Asked Questions

Frequently Asked Questions

Frequently Asked Questions

Frequently Asked Questions

SHARE

What Our Customers Are Saying

Zen is a very professional company that offers top quality material.

"Zen is a very professional company that offers top quality material. Don't waste your money on the big box store products. These guys will build you a higher quality product at a very competitive price."

Arif Maherali

Zen Living make sure the product quality they supplied.

"One of the few companies on my new home build that came back to make sure everything was right and stood by the product they supplied."

Ron

I’m so happy with them. Choose them!

"They are very professional. They did great job. I’m so happy with them. choose them! I strongly recommended them to my friends and community. Especially thanks to Chad, one of their salesmen."

Chuck Oh

The plan came together perfectly!

"I had an excellent experience dealing with Khlood! Service was excellent. Every issue I came up with was handled professionally and to my satisfaction. The cabinets are excellent quality. The plan came together perfectly. I will definitely recommend!"

sk Meghan Whitelaw

The quality and pricing is excellent!

"I am a general contractor who has used Zen for a few kitchen projects. They have always been great to deal with and the quality and pricing is excellent. Ron was always available when I needed something and I will be using them on future projects."

Everett Grey

All the techs that visited my home were friendly and professional!

"I had a great experience with Zen Living. They installed the cabinets in the kitchen and bathroom of my new condo. All the techs that visited my home were friendly and professional, and Kat who I dealt with via email was extremely helpful."

Amanda Nicholson

Very impressed with the quality of your products

"Love our new cabinets!! Our contractor started the install today and we can't wait to see our new kitchen once they're finished. Very impressed with the quality of your products."

Tracie R.

Excellent customer service and communication.

"Excellent customer service and communication. Knowledgable and caring staff worked with us to ensure complete satisfaction with our new kitchen cabinets. Highly recommended!!"

John Starodub

Kitchen Cabinets Calgary

Contact us

We will get back to you as soon as possible!
Icon Close Success
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.